Wed 17 Jun 2015

Amended SEW Maintenance Hole Technical Addendum:

South East Water has updated the Maintenance Hole (MH) Technical Addendum (SEW TA SEW-01-Revision C) which is available to view from its website or by CLICKING HERE.

The Revision C document clarifies requirements associated with internal pipe drops, connections into existing MH structures, access covers and includes updated Standard drawing title blocks and numbering allocation to avoid confusion with previous Water Industry Technical Standards versions. This updated Technical Addendum applies to all South East Water Gravity Sewer projects currently in the design phase process.

General Enquiries can be e-mailed to Colin Paxman at colin.paxman@sew.com.au